Starting a knockdown rebuild process is a little overwhelming. However, knockdown rebuilds are the perfect method for those who want a brand-new home. Knocking down and rebuilding a home is less expensive than renovating the complete house. Throughout this article, we demystify the steps for the Knockdown Rebuild Melbourne.

Understand the site preparation & demolition steps

  • Getting ready for the knockdown rebuild

Doing earlier research on knockdown rebuild & Display Homes For Sale in Melbourne can make the whole process seamless. Try to gather as much information as you can about the existing property and connected services. Furthermore, it helps to limit the site costs & speed the process.

Speak with the local council and the authorities. Obtain an asset protection permit from the local council. Take care of other permits that may be required, like a permit to demolish a building structure. Next, find the demolition company and disconnect the power & gas services.

  • Measuring the land

Before starting a knockdown & rebuild for developing Luxury Home Design & Build, it’s necessary to measure the land to identify the factors that could affect the construction process. Take care of water & power connections. Additionally, the site should be considered before starting the methods.

  • Post demolition steps

Before you hand the site back to the contractors, supply a complete demolition letter with the confirmation of site preparation. Abolition of gas meter & service line, overhead power & installation of underground electricity etc need to be considered.

  • Survey for re-establishment

The contractors also organise the re-establishment survey, which will be carried out to establish the location of boundary lines. Encroachments from the existing structure & fence lines need to be surveyed. This is completed with the help of expert surveyors since they can mark out where the title boundaries are. This step is necessary for all knockdown rebuilds since it indicates the clear tile boundaries.

  • Post demolition inspections

When we move closer to construction, the experts will carry out a series of post-demolition inspections. In this phase, the pre-tender inspections are done by the supervisor, and soil testing, Arborist report, and drainage inspection are also done by the experts.

  • Final site preparation

It’s time to set the sights on onsite construction. Ensure the excessive soil and dirt are cleared from the site. Eliminate all the temporary fencing and cut the grass. When the construction has started, you will be introduced to the on-site team member.

Building a new home is easier & exciting when you know what to expect. When you hire the right team, you will get support from start to finish. The Southern Hemisphere Development experts always focus on transparency, delivery, and support.